发明名称 EXECUTION SCHEDULE ADMINISTRATION DEVICE, EXECUTION SCHEDULE ADMINISTRATION METHOD, AND OPERATION ADMINISTRATION SYSTEM
摘要 <p>An objective of the present invention is to create passenger guide information with which continuance of a connection/standby guide which is highly useful and reliable to railway passengers is possible even when an execution schedule change arises from an operation arrangement input, etc. An operation administration system (10) comprises a connection/standby information change unit (32) with which an operation schedule and passenger guide information are included in which a train operation plan is reflected in an execution schedule which a train which operates on a prescribed operation date uses, which are used in a train operation on a given operation date, a determination is made of connection/standby information which denotes types of connections and standbys of a plurality of trains which are predetermined on the basis of the operation schedule, and if a change of the execution schedule is carried out, the connection/standby information of the plurality of trains is changed according to the changed operation schedule. The administration system (10) further comprises an execution schedule change system (31) with which the changed connection/standby information is reflected in the passenger guide information, and passenger guidance is carried out in a passenger guide processing unit which carries out passenger guiding based on the passenger guide information in which the change of the connection/standby information is reflected.</p>
申请公布号 WO2013084764(A1) 申请公布日期 2013.06.13
申请号 WO2012JP80694 申请日期 2012.11.28
申请人 EAST JAPAN RAILWAY COMPANY;HITACHI INFORMATION & CONTROL SOLUTIONS, LTD.;HITACHI, LTD. 发明人 KIKUCHI MASATAKA;KITAGAWA YUKIHIKO;ISOGAI YASUO;NUMAZAWA YOSHIMI
分类号 B61L25/02 主分类号 B61L25/02
代理机构 代理人
主权项
地址