摘要 |
<P>PROBLEM TO BE SOLVED: To provide a new regeneration method of a thermoplastic resin pipe capable of suitably regenerating an existing pipe even when a vertical shaft selected as a construction starting point exists in a narrow road, and a drum conveyance truck used for the regeneration method of a thermoplastic resin pipe. <P>SOLUTION: In the regeneration method of a thermoplastic resin pipe, for conveying a winding drum 12 around which the thermoplastic resin pipe 100 is wound to the construction starting point, the drum conveyance truck 1 with 700-1,600 mm vehicle width is used. The drum conveyance truck 1 loaded with the winding drum 12 is made to travel to the construction starting point through a road communicated to the construction starting point. <P>COPYRIGHT: (C)2013,JPO&INPIT |