<P>PROBLEM TO BE SOLVED: To reduce the weight of a temporary roof, and to improve working efficiency by constructing the demolition work of a building and the turning work of the temporary roof in parallel. <P>SOLUTION: A temporary curing body 1 includes: a temporary roof 10 covering the upper part of the highest floor of a building 2 in demolition; a temporary side wall 20 covering the side of a demolition construction layer P including at least the highest floor; and a mast 3 arranged so as to be moved downward with respect to the frame of the building 2 at the lower story of the demolition construction layer P and so as to be turned, and configured to support the temporary roof 10 from the lower part. The mast 3 is configured such that its vertical load and horizontal load to be received from the temporary roof 10 are supported by the frame of the building 2, and configured so as to be gradually turned downwardly according as the demolition progresses. <P>COPYRIGHT: (C)2013,JPO&INPIT |