摘要 |
<p>The wall has curable casting material layers attached to an insulating layer (12), and individual insulant blocks (11) arranged on a self-adhesive carrier film (10) i.e. radiation-reflecting film, and joined to form the insulating layer. Contours are formed from the insulating layer that is arranged between the curable casting material layers. A film is formed as a covering layer on the insulating layer. A separation tool outlines the insulating layer, and an assembly platform (7) is arranged outside a manufacturing fixture for manufacturing the wall. The separating tool is designed as a material-removing machine, a non-abrasive machine, a water jet, a laser beam or a firing tool. An independent claim is also included for a method for manufacturing an insulated prefabricated building wall.</p> |