发明名称 |
THE METHOD OF LAYING PLAN CONSIDERING WORKING COMPLETION TIME AND JOB COMPLETION TIME OF CRANE WORK FOR LOADING OR UNLOADING OF CARGO USING TRAIN AT THE CONTAINER TERMINAL |
摘要 |
PURPOSE: A schedule plan establishment method for considering a range of task completion time of a resident company and task completion time of a crane for loading and unloading of railroad goods in a container terminal is provided to effectively establish a task plan for a container task and equipment management. CONSTITUTION: The most minimal solution of adding ranges of task completion time of a crane and task completion time of a resident company is determined as an initial solution(S100). The best solution is determined among a plurality of neighbor solutions which is generated through an exchange method(S200). A schedule plan of a loading or unloading task of the crane is established by the best solution(S300). [Reference numerals] (AA) Start; (BB) End; (S100) Initial solution generating step; (S110) Resident company grouping step; (S120) Candidate solution generating step; (S130) Initial solution determining step; (S200) Solution improving step; (S210) Target function value calculating step; (S220) Initial solution changing step; (S230) Best solution determining step; (S300) Schedule planning step |
申请公布号 |
KR20130053620(A) |
申请公布日期 |
2013.05.24 |
申请号 |
KR20110119098 |
申请日期 |
2011.11.15 |
申请人 |
KRRI |
发明人 |
KIM, DONG HEE;KIM, KYUNG MIN;KIM, KWANG TAE;LEE, TAE YUN |
分类号 |
G06Q10/08 |
主分类号 |
G06Q10/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|