摘要 |
FIELD: mining.SUBSTANCE: method includes the following stages. Installation of a structure inside or tightly with an underground mine, so that the structure provides for reactive forces when pushing a cutting head in direction of the material by means of a series of rigid materials fixed on the structure, which i arranged so that series of rigid elements may be fixed to it simultaneously at least in two directions, so that parts of tunnel branches could be formed in at least two appropriate directions, of the underground mine designed for transportation of people, mechanisms and extracted material. Formation of multiple parts of tunnel branches entering the material. Formation of the first part of the tunnel branch with the help of a cutting head and a series of rigid elements in the first direction, and afterwards formation of the second part of the tunnel branch in the second direction. During formation of the second part of the tunnel branch, movement of rigid elements from the part of the first tunnel into the part of the second tunnel branch for extension of the series of rigid elements in the part of the second tunnel branch.EFFECT: application of the method considerably reduces costs, makes it possible to considerably increase speed of tunnelling and increases efficiency of production.21 cl, 10 dwg |