发明名称 |
BOREHOLE GROUTING INSTALLATION METHOD FOR INSTALLING BOREHOLE SEISMOMETER USING INJECTION PIPE |
摘要 |
PURPOSE: A bore hole grouting construction method using an injection pipe for installing a bore hole seismograph is provided to lower a construction cost and to improve work efficiency by simply installing a bore hole seismograph using an injection pipe instead of a grouting device. CONSTITUTION: A bore hole grouting construction method comprises the following steps: excavating a bore hole(S41); installing an outer casing inside the bore hole(S42); installing an injection pipe in the outer side of an inner casing(S43); inserting the inner casing installed with the injection pipe into the outer casing(S44); injecting a grout material by the injection pipe in the upper side of the bore hole for performing a grouting work(S45); and installing a seismic sensor inside the inner casing and performing a finishing work(S46). [Reference numerals] (S41) Excavate a bore hole; (S42) Install an outer casing in the excavated bore hole; (S43) Install an injection pipe outside an inner casing for injecting a grout material from the entry of the bore hole; (S44) Insert the inner casing installed with the injection pipe in the outer casing; (S45) Perform a grouting work by injecting the grout material from the entry of the bore hole through the injection pipe; (S46) Install a seismic sensor inside the inner casing after completion of the grouting work and perform a finishing work
|
申请公布号 |
KR101264917(B1) |
申请公布日期 |
2013.05.15 |
申请号 |
KR20130023332 |
申请日期 |
2013.03.05 |
申请人 |
HEESONG GEOTEK CO., LTD. |
发明人 |
KIM, KI SEOG;YU, GWANG MOON |
分类号 |
E02D3/12 |
主分类号 |
E02D3/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|