摘要 |
The method involves generating a proposed pool schedule, and establishing future time period pre-settings for an operation of a remote energy generation plant (10). The proposed pool schedule is transmitted to a central control unit (24) over a computer network (22) e.g. wide area network. The schedule is transmitted from the central control unit to a remote control unit (36) over the computer network. The remote energy generation plant is automatically controlled by the remote control unit according to the schedule. An independent claim is also included for a system for operating a remote energy generation plant using a renewable energy source, comprising a central control unit. |