发明名称 Network Aware Process Scheduling
摘要 A schedule graph may be used to identify executable elements that consume data from a network interface or other input/output interface. The schedule graph may be traversed to identify a sequence or pipeline of executable elements that may be triggered from data received on the interface, then a process scheduler may cause those executable elements to be executed on available processors. A queue manager and a load manager may optimize the resources allocated to the executable elements to maximize the throughput for the input/output interface. Such as system may optimize processing for input or output of network connections, storage devices, or other input/output devices.
申请公布号 US2013117759(A1) 申请公布日期 2013.05.09
申请号 US201213461752 申请日期 2012.05.01
申请人 GOUNARES ALEXANDER G.;GARRETT CHARLES D.;CONCURIX CORPORATION 发明人 GOUNARES ALEXANDER G.;GARRETT CHARLES D.
分类号 G06F9/50 主分类号 G06F9/50
代理机构 代理人
主权项
地址