发明名称 LOAD CONTROLLER, PROGRAM, LOAD CONTROL SYSTEM
摘要 A load controller (1) is provided with a measurement unit (11) for measuring the consumed power of a load device (4) and the generated power of a power generator (2), and a control unit (10) for controlling the operation of a hot water supply device (41) based on the measurement results of the measurement unit (11). The control unit (10) predicts the surplus power generated in the target period in the future with a prediction unit (12). A decision unit (13) compares the power and time needed from the start of the specified process by the hot water supply device (41) until the end to the prediction results of the prediction unit (12), and decides whether the hot water supply device (41) executes the above process at surplus power in the target period. An execution unit (14) controls the operation of the hot water supply device (41) so that the above process is started by transmitting the control signal to the hot water supply device (41) when it was decided in the decision unit (13) that it is possible to execute the above process. Thus, the disadvantages can be avoided by the surplus power becoming zero after the load device starts the specified process by using surplus power and before this process starts.
申请公布号 WO2013062016(A1) 申请公布日期 2013.05.02
申请号 WO2012JP77512 申请日期 2012.10.24
申请人 PANASONIC CORPORATION 发明人 HIBIYA, SHINPEI;TAKEHARA, KIYOTAKA;NOMURA, HITOSHI
分类号 H02J3/38;H02J3/32 主分类号 H02J3/38
代理机构 代理人
主权项
地址