摘要 |
A method for pipeline laying includes trench digging, jointing pipes into pipeline, arrangement of heat insulation, laying pipeline to trench, trench filling and consolidation of earth. The trench is dug in L-like form, at that reaming in vicinity of basis has square cross section lifted over the basis to height H, the trench to height H is filled with ballast for passage of draining waters. |