摘要 |
FIELD: mining.SUBSTANCE: method involves separation of panels into individually ventilated blocks, in which second working and first working is performed. First working is ahead of second working at least by one block; at that, second working in adjacent blocks is performed simultaneously. Air supply and ventilation mine workings are routed along the panel boundaries. Each block of the panel is outlined on three sides with first block working. Panel and block mine workings are located symmetrically relative to the panel axis and connected to each other by means of cross passages made at the beginning of each of the blocks. Local ventilation plants are located in T-pieces arranged on the panel axis and on its boundaries at connections to main entries. Return ventilation air jet is removed from the T-piece to main entries through a crossing. The panel is developed in the direct order by means of subsequent development of blocks, and reserves of each of the blocks are developed in reverse order. Delivery of mined rock from the blocks is performed to two unloading points located at the connections to main entries.EFFECT: increasing the panel productivity and reducing the time of its preparation and commissioning.12 cl, 1 dwg |