发明名称 TUNNEL CONSTRUCTION METHOD WITH SUPPORT WALLS
摘要 PURPOSE: A tunnel construction method using a reinforcing wall is provided to increase stability by decreasing ground settlement, crown displacement, convergence displacement, face displacement and support stress. CONSTITUTION: A tunnel construction method using a reinforcing wall is as follows. A plurality of reinforcing walls(100) are formed on both sides of a tunnel excavated. The reinforcing wall supports the load of upper ground of the tunnel excavated. A loop of the tunnel is formed between the reinforcing walls. The loop of the tunnel is connected to the reinforcing wall. The inside of the tunnel is finished.
申请公布号 KR101254608(B1) 申请公布日期 2013.04.15
申请号 KR20100080286 申请日期 2010.08.19
申请人 发明人
分类号 E21D9/00;E21D11/00;E21D11/18 主分类号 E21D9/00
代理机构 代理人
主权项
地址