摘要 |
<P>PROBLEM TO BE SOLVED: To provide a system and a method of leakage control in an asynchronous pipeline. <P>SOLUTION: A signal is received from a preceding stage at an operative stage of an asynchronous circuit device, and a switch associated with the operative stage is activated in response to control signals being sent to the operative stage to make power to the operative stage available. <P>COPYRIGHT: (C)2013,JPO&INPIT |