摘要 |
<p>The scaffold has upright frame (1a,1b) with vertical stand pipes (2a,2b), and diagonal struts (8). The shock latch (4) is passed through the shock levels of stand pipes and arranged with evenly spaced connection sleeve (5) into which incoming stand pipes from below and outgoing stand pipes are inserted from above. The connection element is provided for attachment of the diagonal struts at outer side of shock latch.</p> |