发明名称 |
METHOD AND SYSTEM FOR MANAGING CONSTRUCTION PROJECTS |
摘要 |
<p>Methods and systems for managing construction projects are provided. The methods and systems can be based on component-associated data where components can be assigned identifiers, drawings, cost codes, and man-hour values according to industry standards. Components can be grouped, sorted, searched and accessed through a database (a component library). Project schedules and work packages can be formed based on components and their associated data through a planning system. The schedule can be altered at the component level by adding or removing components, or stretching or shrinking the schedule. Constraints can be used to restrict a schedule or work package from being released until the constraints are satisfied. Once released, schedules can be updated to track construction progress of the project underway through a tracking system. Reports can be generated to reflect productivity of construction crews or individuals and track progress of the project.</p> |
申请公布号 |
WO2013040682(A1) |
申请公布日期 |
2013.03.28 |
申请号 |
WO2012CA00863 |
申请日期 |
2012.09.19 |
申请人 |
ELEMENT INDUSTRIAL SOLUTIONS INC.;MACELHERON, SANDY;HONG, GANG;SWAN, BEN |
发明人 |
MACELHERON, SANDY;HONG, GANG;SWAN, BEN |
分类号 |
G06Q10/06;G06Q50/08 |
主分类号 |
G06Q10/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|