发明名称 CONSTRUCTION METHOD FOR WALL BALUSTRADE OF PROJECTION CONSTRUCTED PC BRIDGE
摘要 <P>PROBLEM TO BE SOLVED: To provide a construction method for a wall balustrade of a projection constructed PC bridge that can be constructed at low cost in a short construction period has high finish precision. <P>SOLUTION: For projection construction of a bridge superstructure of a PC bridge, a wall balustrade outer surface precast concrete panel 140 having a construction attitude-adjustable fitting part is temporarily fixed at a wall balustrade position of the bridge superstructure simultaneously in parallel with an operation for the projection construction. After the operation for the projection construction, the construction attitude of the wall balustrade outer surface precast concrete panel 140 is adjusted to make a balustrade array of high precision, the wall balustrade outer surface precast concrete panel 140 is fixed at the wall balustrade position. After reinforcing bars of the wall balustrade are arranged, a wall balustrade inner surface forming form 150 is constructed, and concrete is cast into the space between the wall balustrade outer surface precast concrete panel 140 and the wall balustrade inner surface forming form 150. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP2013057215(A) 申请公布日期 2013.03.28
申请号 JP20110197384 申请日期 2011.09.09
申请人 PS MITSUBISHI CONSTRUCTION CO LTD;TAKIGAMI STEEL CONSTRUCTION CO LTD;TOKAI CONCRETE INDUSTRIES CO LTD 发明人 OKABE NARIYUKI;IWASAKI DAISUKE;KAMEYAMA SEIJI;SHIMADA YOSHINORI
分类号 E01D19/10;E01D21/00;E01D21/10 主分类号 E01D19/10
代理机构 代理人
主权项
地址