摘要 |
FIELD: mining.SUBSTANCE: root layer is formed due to removal, loading, transportation and application to the dump surface of overburden rocks from top overburden bench, which consist of fertile soil layer and basement rocks. Then, vegetation cover is formed using the planting material treated with complex biological preparation.EFFECT: reduction of reclamation periods; increase in durability of cultivated forest and grassy ranges on reclamated lands. |