发明名称 |
REVERSE INSTALLATION CONSTRUCTION PROCESS OF BOLT-BALL NET RACK CYLINDRICAL SHELL STORAGE BIN |
摘要 |
<p>A reverse installation construction process of a bolt-ball net rack cylindrical shell storage bin is divided into installation of a starting unit and installation of overhanging small splicing units, and comprises the steps of: using a numerical wind tunnel technology and a finite element algorithm to obtain sizes of net rack node rod members and making a construction drawing; completing the primary connection of the small splicing units on the ground in advance; completing the installation of the starting unit, the starting unit being divided into sections A, B and C, which are assembled using a crane for integral installation; performing overhanging installation on the small splicing units from two sides of the starting unit to two ends of the cylindrical shell; and performing subsequent installation of a panel and internal devices after the installation of the net rack.</p> |
申请公布号 |
WO2013037253(A1) |
申请公布日期 |
2013.03.21 |
申请号 |
WO2012CN79836 |
申请日期 |
2012.08.08 |
申请人 |
XUZHOU ZHONGMEI BAIJIA STEEL TECHNOLOGY CO., LTD.;ZHU, XINYING;NIU, SHANGZHOU;LIU, YU;WANG, JIE |
发明人 |
ZHU, XINYING;NIU, SHANGZHOU;LIU, YU;WANG, JIE |
分类号 |
E04G21/14;E04B1/342;E04B1/35;E04B7/08;E04H7/30;G06F17/50 |
主分类号 |
E04G21/14 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|