摘要 |
The time required for a success or failure determination step and the precision of the success or failure determination step are optimized by determining region-based connector or wiring information and by adjusting increase and decrease of the number of such patterns. Region-based connector or wiring information is created for at least every described region in numbers equal to the number of combinations of a first wire harness, a second wire harness, and a third wire harness. The first wire harness is one of first wire harnesses arrangeable in Main 1, the second wire harness is one of second wire harnesses arrangeable in Main 2, and the third wire harness is one of third wire harnesses arrangeable in Sub, and presence or absence of error in connection of electric wires is inspected in the created region-based connector or wiring information. |