发明名称 Construction work management system for which a matrix technique was used and method thereof
摘要 PURPOSE: A construction work management apparatus and a method thereof are provided to express an object for performance construction task display in a matrix method. CONSTITUTION: A main control unit(400) extracts a matrix sheet for construction management by output request of a matrix sheet for construction management. The main control unit outputs the outputted sheet through an information output unit(300). The main control unit processes an input request of the construction information about a work business display object. [Reference numerals] (101) New matrix sheet DB; (102) Process matrix sheet DB; (103) Construction work CAD drawing DB; (200) Information input unit; (300) Information output unit; (410) Matrix X/Y axis node input information process engine; (420) Object input information process engine for performance construction work display; (430) Guideline engine for performance construction; (440) Construction work drawing generating engine; (450) Multi-dimensional layer processing engine; (460) Object moving process engine for performance work display
申请公布号 KR101204356(B1) 申请公布日期 2013.03.18
申请号 KR20110027941 申请日期 2011.03.29
申请人 发明人
分类号 G06F19/00 主分类号 G06F19/00
代理机构 代理人
主权项
地址