发明名称 DEMAND-DRIVEN COLLABORATIVE SCHEDULING FOR JUST-IN-TIME MANUFACTURING
摘要 A schedule manager may include a chromosome comparator configured to compare a plurality of schedule chromosomes, each schedule chromosome including a potential schedule of use of manufacturing resources within one or more time intervals in producing one or more items, and configured to compare each of the plurality of schedule chromosomes relative to constraints, to thereby output a selected subset of the plurality of schedule chromosomes. The schedule manager may include a chromosome combiner configured to combine schedule chromosomes of the selected subset to obtain a next generation of schedule chromosomes for output to the chromosome comparator and for subsequent comparison therewith of the next generation of schedule chromosomes with respect to the constraints, as part of an evolutionary loop of the plurality of schedule chromosomes between the chromosome comparator and the chromosome combiner, and a scheduler configured to select a selected schedule chromosome therefrom.
申请公布号 EP2568424(A1) 申请公布日期 2013.03.13
申请号 EP20120005802 申请日期 2012.08.09
申请人 SAP AG 发明人 LI, WEN-SYAN;WANG, HENG;SUN, GUFEI
分类号 G06Q10/08 主分类号 G06Q10/08
代理机构 代理人
主权项
地址