摘要 |
A subsea test tree control system provides operational control and power to subsea test tree equipment located within a subsea riser without an in riser umbilical to supply additional power to the subsea test tree control system. The subsea test tree control system includes a subsea horizontal subsea tree landed on a subsea wellhead, and a subsea control module communicatively coupled to the horizontal subsea tree. A subsea test tree stack is landed through the riser in the horizontal subsea tree. A subsea control module communication line extends through the horizontal subsea tree to terminate at a bore of the horizontal subsea tree proximate to the tubing hanger, and a riser string communication line communicatively couples to the subsea control module communication line to provide operational power and control the subsea test tree stack. Intervention workover control system umbilicals may bypass the subsea control module and directly connect to the subsea control module communication line.
|