发明名称 VERTICAL POWER BUDGETING AND SHIFTING FOR 3D INTEGRATION
摘要 A method is provided for managing power distribution on a 3D chip stack having two or more strata, a plurality of vertical power delivery structures, and multiple stack components. At least two stack components are on different strata. Operating modes are stored that respectively have different power dissipations. A respective effective power budget is determined for each of the at least two stack components based on respective ones of the operating modes targeted therefor, and power characteristics and thermal characteristics of at least some of the stack components inclusive or exclusive of the at least two stack components. The respective ones of the plurality of operating modes targeted for the at least two stack components are selectively accepted or re-allocated based on the respective effective power budget for each of the at least two stack components, power constraints, and thermal constraints. The power constraints include vertical structure electrical constraints.
申请公布号 US2013055185(A1) 申请公布日期 2013.02.28
申请号 US201113217429 申请日期 2011.08.25
申请人 BOSE PRADIP;CARPENTER GARY D.;FLOYD MICHAEL S.;KURSUN EREN;RESTLE PHILLIP J.;SCHEUERMANN MICHAEL R.;INTERNATIONAL BUSINESS MACHINES CORPORATION 发明人 BOSE PRADIP;CARPENTER GARY D.;FLOYD MICHAEL S.;KURSUN EREN;RESTLE PHILLIP J.;SCHEUERMANN MICHAEL R.
分类号 G06F17/50 主分类号 G06F17/50
代理机构 代理人
主权项
地址