发明名称 |
OPTIMIZED DIGITAL FACTORY PRODUCTION PLAN & CONFIRM SYSTEM BY USING REAL-TIME FACTORY SITUATION |
摘要 |
PURPOSE: An optimized production plan of a digital factory reflecting a real time factory situation and a result confirmation system are provided to add a scheduler function to the digital factory, thereby supplying a dynamic digital factory. CONSTITUTION: A 4M real measurement unit(41) measures human and material resources of a real factory(1). A 4M standard time calculation unit(42) calculates each 4M standard time through a 4M database which is constructed through the 4M real measurement unit. A task scenario generation unit(44) generates a production scenario corresponding to optimized production efficiency. A scenario schedule display unit(46) displays the generated task scenario in real time. [Reference numerals] (1) Real factory; (41) 4M real measurement unit; (42) 4M standard time calculation unit; (43) 4M data change input unit; (44) Task scenario generation unit; (45) Order data input unit; (46) Scenario schedule display unit |
申请公布号 |
KR20130016857(A) |
申请公布日期 |
2013.02.19 |
申请号 |
KR20110079020 |
申请日期 |
2011.08.09 |
申请人 |
DIGITAL FACTORY CO., LTD. |
发明人 |
KIM, SU YOUNG |
分类号 |
G06Q10/06;G05B19/418;G06Q10/04 |
主分类号 |
G06Q10/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|