摘要 |
PURPOSE: A facility overheating and freezing prevention apparatus is provided to reduce energy consumption by including a heat pipe embedded in a heat switching unit. CONSTITUTION: A heat switching unit(120) is installed in a facility. The heat switching unit switches the facility. A heat pipe(130) inserts working fluid. The heat pipe is arranged to be adjacent to the heat switching unit. The heat pipe is embedded under the underground. |