<P>PROBLEM TO BE SOLVED: To provide a tank module of a nuclear power plant which can reduce costs as much as possible and shorten a construction period. <P>SOLUTION: A tank module installed on a framework ceiling of a nuclear power station is provided. The tank module comprises: a tank installed to secure a pump suction pressure in a nuclear reactor auxiliary cooling-water system or a turbine auxiliary cooling-water system; and temporary construction materials to which the tank is fixed, and installed on the framework ceiling. The temporary construction materials includes: a ceiling installed with a foundation base to which the tank is fixed; a plurality of columnar supports for supporting the ceiling; and plates each fixed to each columnar support on an opposite side of the ceiling, and fixed to the framework ceiling. <P>COPYRIGHT: (C)2013,JPO&INPIT |