摘要 |
<P>PROBLEM TO BE SOLVED: To provide a wave power generation system capable of being constructed at low cost by installing a wave energy introducing part at a shore upon its being brought thereto. <P>SOLUTION: The configuration includes the wave energy introducing part 4 installed at the shore and formed in such an arrangement as to substitute wave motions with an increase and decrease of air pressure, power generating equipment 60 installed on a place of land apart from the shore and capable of changing air motions into electric power, and a ventilation line 40 which makes the wave energy introducing part 4 communicate with the power generating equipment 60, wherein the wave energy introducing part 4 is structured so that a casing 20 over an undersurface aperture is protruded to the water side from a fixation part fixed to the shore and part of the water surface adjoining to the shore is partitioned by the bottom of the casing 20. The ventilation line 40 has in its midway a buffer tank 44 installed on a place of land apart from the shore. <P>COPYRIGHT: (C)2013,JPO&INPIT |