发明名称 WET-TYPE CONSTRUCTING METHOD OF PIER FOUNDATION
摘要 PURPOSE: A wet process system construction method of piers secures a space for construction of piers using a sheet pile and installing a cofferdam. A construction period and a cost are saved by omitting the sand shaft toward the space inside the cofferdam or the radical position of the sheet pile. CONSTITUTION: A wet process system construction method of piers comprises the steps of: forming a cofferdam which forms a closed space by mounting multiple piles(2) and a rock(11), and by mounting multiple sheet piles(1) which surrounds an area of mounted piles, pouring a underwater concrete on the bottom of the inner space of the cofferdam in the state of not draining a water which is trapped in the inner space of a cofferdam, constructing a pier foundation and a pier body in the inner space of the cofferdam, being drawn a sheet pile and demolish the cofferdam.
申请公布号 KR20130013287(A) 申请公布日期 2013.02.06
申请号 KR20110074846 申请日期 2011.07.28
申请人 DAEWOO ENGINEERING & CONSTRUCTION CO., LTD. 发明人 KIM, GEUN YOUNG;KIM, YONG WOO;CHAI, BONG CHUL;KIM, YOUNG JIN;KIM, KYOUNG O
分类号 E01D19/02;E01D21/00;E02D19/02 主分类号 E01D19/02
代理机构 代理人
主权项
地址