摘要 |
An construction workflow tracking system is presented where the tracking system is capable of tracking component-level information associated with achieving closure for an Inspection, Tests, Analyses, and Acceptance Criteria (ITAAC) under 10 CFR Part 52 for licensing of new nuclear power reactors. Disclosed systems include an estimation engine configured to analyze workflow data points to estimate one or more compliance metrics, especially compliance dates (e.g., inspection dates, test dates, acceptance dates, etc.). A reporting engine can present estimated compliance dates with a confidence level or recommendations on improving confidence or reducing risk. Compliance dates can also include compromise dates indicating when a closed ITAAC is likely to be compromised.
|