发明名称 |
Retrofitting of a nuclear power plant |
摘要 |
<p>The method involves supplying vapor of vapor generating unit to steam turbine (17), prior to conversion to nuclear steam generating unit. A heat recovery steam generator (2) is replaced during nuclear steam generating unit conversion, and additionally ballast steam turbine (12) is reinstalled. The vapor of high-pressure steam generator (8) is supplied to exhaust steam (18) of ballast steam turbine. The heat recovery steam generator has medium-pressure steam generator (9) that supplies steam of steam turbine (16) with intermediate pressure level. An independent claim is included for converted nuclear power plant.</p> |
申请公布号 |
EP2551475(A2) |
申请公布日期 |
2013.01.30 |
申请号 |
EP20120005081 |
申请日期 |
2012.07.09 |
申请人 |
BABCOCK BORSIG STEINMUELLER GMBH |
发明人 |
SCHROEDER, KARL-FRIEDRICH, DR. |
分类号 |
F01K13/00;F01K7/22;F01K23/10;F22B1/18 |
主分类号 |
F01K13/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|