<p><P>PROBLEM TO BE SOLVED: To provide a list preparation system which can easily prepare a list regarding notification of a large-scale construction with which a submission state of notification can be comprehensively confirmed. Ž<P>SOLUTION: The list preparation system (1) includes: a construction extraction means (11) which extracts the plurality of constructions constituting the large-scale construction from the types of the large-scale constructions; a notification determination means (13) which determines requirement of notification required for each of the plurality of extracted constructions; and a preparation means (16) which prepares an authority notification management list associated with the plurality of extracted constructions and notification. Ž<P>COPYRIGHT: (C)2011,JPO&INPIT Ž</p> |