发明名称 |
System and method for modifying scheduling of queries in response to the balancing average stretch and maximum stretch of scheduled queries |
摘要 |
A mixed workload scheduler and operating method efficiently handle diverse queries ranging from short less-intensive queries to long resource-intensive queries. A scheduler is configured for scheduling mixed workloads and comprises an analyzer and a schedule controller. The analyzer detects execution time and wait time of a plurality of queries and balances average stretch and maximum stretch of scheduled queries wherein query stretch is defined as a ratio of a sum of wait time and execution time to execution time of a query. The schedule controller modifies scheduling of queries according to service level differentiation.
|
申请公布号 |
US8365174(B2) |
申请公布日期 |
2013.01.29 |
申请号 |
US20080251272 |
申请日期 |
2008.10.14 |
申请人 |
GUPTA CHETAN KUMAR;WANG SONG;MEHTA ABHAY |
发明人 |
GUPTA CHETAN KUMAR;WANG SONG;MEHTA ABHAY |
分类号 |
G06F9/46;G06F17/30 |
主分类号 |
G06F9/46 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|