摘要 |
An installation structure of reinforcement of cargo space of a container carrier is provided to reduce amount of residual grit stacked on inner surface of reinforcement while paving a cargo space and then collect the grit after quickly and safely completing paving work. An installation structure of reinforcement of cargo space of a container carrier comprises a longitudinal member(20) of a container carrier; a traverse member(30) installed to cross over the longitudinal member; and a reinforcement(40) reinforcing the structural strength; The reinforcement comprises a vertical part(41) assembled to the bottom of the longitudinal member; and a horizontal part(42) formed horizontally at the tip of the vertical part. The horizontal part is oriented toward an outer panel of a hull. |