摘要 |
<p>The method involves attaching an active sealant and a sealing mat to the building, and applying the sealant on a flat outer side of the sealing mat, after which the sealing mat is mounted on the building, such that the sealant comes to rest on the building surface. The fully adhered needled geosynthetic clay liner, particularly a bentonite mat is applied. The sealant is sprinkled prior to needling in the upper side of the web or the bentonite mat. An independent claim is included for a sealing mat for sealing a building or a structural component, which has a carrier layer made of nonwoven fabric, a clay layer made of sodium bentonite powder, and a sealant made of sodium carbonate.</p> |