发明名称 |
STRIP CHANGE METHOD OF SEABED PIPE LINE |
摘要 |
PURPOSE: A method for changing a strip of a seabed pipeline using a lifting jig is provided to quickly replace strips with a lifting jig when the strips for fastening seabed pipelines and the seabed communication cables are damaged. CONSTITUTION: A method for changing a strip of a seabed pipeline using a lifting jig is as follows; searching damage to a strip for fastening a seabed pipeline and a seabed communication cable(S110); moving a lifting jig to the seabed pipeline where the damaged strip is positioned; gripping the outer periphery of the seabed pipeline with the lifting jig(S130); pulling the seabed pipeline by rising up the lifting jig when the lifting jig stably grips the seabed pipeline(S140); replacing the damaged strip to a new strip when a gap is formed between the seabed pipeline and the seabed(S150); lowering the lifting jig to position the pulled seabed pipeline on the seabed(S160); separating the lifting jig and the seabed pipeline. [Reference numerals] (AA) Start; (BB) End; (S110) Step of inspecting a strip; (S112) Step of providing information; (S114) Step of recognizing a damaged strip; (S120) Step of lowering a lifting jig; (S130) Step of gripping a seabed pipeline; (S140) Step of lifting the seabed pipeline; (S150) Step of replacing a strip; (S160) Step of positioning the seabed pipeline; (S170) Step of separating the lifting jig; (S210) Step of inserting a spacer; (S220) Step of proping; (S230) Step of removing the spacer |
申请公布号 |
KR20130003925(A) |
申请公布日期 |
2013.01.09 |
申请号 |
KR20110065570 |
申请日期 |
2011.07.01 |
申请人 |
HYUNDAI HEAVY INDUSTRIES CO., LTD. |
发明人 |
NA, YOUNG JANG |
分类号 |
B66C1/56;B66C1/59;B66C3/04 |
主分类号 |
B66C1/56 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|