发明名称 WORKING AREA CALCULATING METHOD FOR EXCAVATOR
摘要 PURPOSE: An excavator work area calculation method is provided to calculate an optimal horizontal excavation distance and vertical excavation depth, thereby excavating a large amount of soil without the ground collapsing. CONSTITUTION: An excavator specification and the amount of soil are inputted, and an initial value of vertical excavation depth is set(S11). A virtual plane breaking surface and soil wedge weight are calculated in the vertical excavation depth, and the initial value of excavator weight located in a soil wedge area is set(S14). When the virtual plane breaking surface is broken by partial excavator weight, a bucket area sectional section is calculated and stored by using horizontal and vertical excavation depths before the virtual plane breaking surface is broken. [Reference numerals] (AA) Start; (BB) End; (S11) Setting an excavator specification and a soil parameter; (S12) Setting an initial value of vertical excavation depth; (S13) Calculating a virtual plane breaking surface and a soil wedge area; (S14) Setting an initial value of a partial excavator weight; (S15) Is the virtual plane breaking surface broken?; (S16) Is the partial excavator weight is less than a standard value of an entire excavator weight?; (S17) Increasing the partial excavator weight; (S18) Calculating a conduction safe distance; (S19) Storing a bucket area cross section and a calculated result value after calculation a horizontal excavation distance; (S20) Is the vertical excavation depth over than the standard value?; (S21) Selecting the optimal conduction safe distance and the vertical excavation depth by comparing the bucket area cross section; (S22) Increasing the vertical excavation depth
申请公布号 KR101217534(B1) 申请公布日期 2013.01.02
申请号 KR20120013686 申请日期 2012.02.10
申请人 IUCF-HYU (INDUSTRY-UNIVERSITY COOPERATION FOUNDATION HANYANG UNIVERSITY) 发明人 KIM, JEONG HWAN;JANG, JUN HYUN;MIN, JI HONG;SEO, JONG WON
分类号 G06F19/00;E02F9/20 主分类号 G06F19/00
代理机构 代理人
主权项
地址