摘要 |
PURPOSE: An installation method for a prefabricated walking deck is provided to improve quality by standardizing members of the walking deck. CONSTITUTION: An installation method for a prefabricated walking deck is as follows. A base position on a construction site is selected and displayed using temporary frames. Structure frames, deck frames, and handrail completion frames(400) are manufactured based on the temporary frames. The structure frames are fixed to the top of a foundation, and the heights thereof are adjusted. The deck frames are assembled on the structure frames. The handrail completion frames are assembled on the deck frames. |