发明名称 PRETENSIONED ROCK BLASTING METHOD
摘要 PURPOSE: A pretension arm blasting method is provided to accurately excavate rock and minimize overbreak and damage by inserting pretension induction units in tension induction holes to crush the rock with tension of the pretection induction units. CONSTITUTION: A pretension arm blasting method comprises the steps of: forming tension induction holes(5) and charging holes(7) in rock(3) along a designed plane(1) of a tunnel or slope, wherein the interval of the tension induction holes is the minimum distance to form a designed section out of connected crack surfaces; inserting pretension induction units in the tension induction holes; expanding the pretension induction units with one of hydraulic pressure, pneumatic pressure, and mechanical pressure to generate tension at the right angle to the designed plane of the tunnel or slope in each tension induction hole; placing gunpowder in the charging holes; blasting the gunpowder in the charging holes to excavate the designed section of the tunnel or slope first; and excavating the designed section of the tunnel or slope secondly using tension.
申请公布号 KR101216592(B1) 申请公布日期 2012.12.31
申请号 KR20120080379 申请日期 2012.07.24
申请人 DAEWOO ENGINEERING & CONSTRUCTION CO., LTD. 发明人 KIM, WOONG KU;SEO, KYOUNG WON;KIM, YOU SEOK;KIM, YOUNG JIN
分类号 F42D1/00;F42D3/04 主分类号 F42D1/00
代理机构 代理人
主权项
地址