摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a humidity conditioner capable of performing fan control without influenced by a temperature change. <P>SOLUTION: Power consumption of a fan is integrated till a predetermined time passes, and the number of revolutions of the fan is controlled so that an integrated value of power consumption becomes a required power value of a preset target quantity of airflow. Operation for adjusting the number of revolutions is performed per a predetermined time in humidity conditioning operation. In integration of power consumption, an intermediate time between a predetermined initial time just after switching and a predetermined end time before switching is used as an integration time out of operation time of a first operation and a second operation, and in the ventilation operation, operation time after the predetermined initial time passes is used as an integration time. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |