发明名称 |
MANAGEMENT SYSTEM FOR PLANED OUTAGE AND METHOD THEREOF |
摘要 |
PURPOSE: A distribution line dead-line work management and a method thereof are provided to secure the safety of a worker by supporting an operation to prevent a human error in a manual operation. CONSTITUTION: A dead-line work reviewing and managing server(100) writes a work order by obtaining various information from a distribution automation system(200). The distribution automation system includes a transformation operating server(210), a distribution automation server(230), a transformation operating information DB(220), and a distribution system connection information DB(240). The distribution automation sever monitors a power flow and a current state of a distribution network by collecting power information through a distribution automation communication network(300). A distribution automation terminal device(450) and a distribution line switch(440) are installed in a distribution line(400). A user terminal(500) provides interface for monitoring and controlling a system to a user. [Reference numerals] (100) Dead-line work reviewing and managing server; (210) Transformation operating server; (220) Transformation operating information DB; (230) Distribution automation server; (240) Distribution system connection information DB; (250) Section load DB; (300) Distribution automation communication network; (410) Substation breaker; (420) Substation terminal device; (430) Distribution line breaker; (440) Distribution line switch; (450) Distribution automation terminal device; (500) User terminal
|
申请公布号 |
KR101215595(B1) |
申请公布日期 |
2012.12.26 |
申请号 |
KR20110063165 |
申请日期 |
2011.06.28 |
申请人 |
KOREA ELECTRIC POWER CORPORATION |
发明人 |
SHIN, JUNG HOON;SHIN, CHANG HOON;HA, BOK NAM |
分类号 |
H02J13/00;H02J3/14 |
主分类号 |
H02J13/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|