摘要 |
A computer-based method for simulating an overall effect of a component replacement on the reliability of a platform is described. The method includes determining a scheduled reliability for a platform based on a reliability associated with each of the removable components of the platform, selecting, via a user interface, at least one removable component of the platform for which replacement is to be simulated, determining, using a computer-based model, an effect the one or more replacements would have on the forecasted reliability for the platform, and providing a comparison of the forecasted reliability and the scheduled reliability to a user. |