摘要 |
<P>PROBLEM TO BE SOLVED: To stably acquire a high power generation efficiency in each biomass power generation facility, even when a generation amount of biomass resources is varied. <P>SOLUTION: The biomass power generation system includes: resource storages 51-54 for temporarily storing biomass resources generated at resource generation points 11-14, the resource storages provided for each of the resource generation points; and transport routes 31 for distributingly transporting the biomass resources that are stored in the resource storages 51-54, to respective biomass power generation facilities 21-23. A resource distribution transport volume calculation device 60 calculates the transport volumes of the biomass resources that are distributedly transported from the resource storages 51-54 to the respective biomass power generation facilities 21-23 on the basis of the stockpiles of the biomass resources stored in the resource storages 51-54 and preset operating conditions of the respective biomass power generation facilities 21-23. <P>COPYRIGHT: (C)2013,JPO&INPIT |