摘要 |
PURPOSE: A method for simultaneously constructing a framework and an outer window is provided to prevent interference when a lift for lifting an outer window is installed using a gang form. CONSTITUTION: A method for simultaneously constructing a framework and an outer window is as follows. Frameworks(100) are successively installed on the ground. The external wall of the skeleton in the first lower story(11) of an uppermost story(10) is removed. Outer windows(50) are lifted up and installed from the first story to the second lower story of the uppermost story using a lift(40). The outer windows installed from the first story to the third lower story(13) of the uppermost floor are successively caulked and finished.
|