发明名称 SERVER AND POWER SUPPLY TEST METHOD
摘要 A control server is electronically connected with a number of test servers via a number network interfaces. The control server records a network interface number and an IP address of a baseboard management controller (BMC) of each test server, sets an IP address of a network card of the control server, and generates a test command. The test command comprises information in relation to a number of times for powering on a test server, a number of times for powering off the test server, and a time interval between a power-on operation and a power-off operation. The test command is sent to each test server by the control server according to the network interface number and the IP address of the test server. After receiving the test command, the BMC of the test server performs power-on/power-off operations of the test server according to the test command.
申请公布号 US2012304011(A1) 申请公布日期 2012.11.29
申请号 US201213425433 申请日期 2012.03.21
申请人 LAI WEN-BIN;HON HAI PRECISION INDUSTRY CO., LTD.;HONG FU JIN PRECISION INDUSTRY (SHENZHEN) CO., LTD. 发明人 LAI WEN-BIN
分类号 G06F11/22 主分类号 G06F11/22
代理机构 代理人
主权项
地址