发明名称 METHOD TO BALANCE BUILDINGS AND STRUCTURES
摘要 FIELD: construction.SUBSTANCE: method to balance buildings and structures including drilling in soil of wells. A pit is dug at the side of a least sunk part of a building, a structure. The depth of the pit, under which damage starts, is determined with account of maximum depth of well drilling from the foot according to the given dependence. Assembly of rails or guides perpendicularly to a list direction. Assembly of a plant for horizontal drilling of wells. Drilling of horizontal wells of alternating diametre in one row in several stages. The diametre of wells is selected based on structural assumptions and based on possibilities of the drilling plant. Based on the selected dimensions, a pitch of drilling wells, the rated pitch and the diametre of wells is determined according to the calculation based on the pressure value to be pulled when drilling for sight pillar damage, at the same time the damaging pressure is defined using the given dependence.EFFECT: invention provides for levelling of buildings and structures exposed to uneven deformations of a base without soaking, lower material intensity and labour intensiveness.3 dwg
申请公布号 RU2468150(C1) 申请公布日期 2012.11.27
申请号 RU20110128675 申请日期 2011.07.11
申请人 OBSHCHESTVO S OGRANICHENNOJ OTVETSTVENNOST'JU NAUCHNO-PROIZVODSTVENNAJA FIRMA "INTERBIOTEKH" (OOO NPF "INTERBIOTEKH") 发明人 ZOTOV VITALIJ DMITRIEVICH;DYBA VLADIMIR PETROVICH;ZOTOV MIKHAIL VITAL'EVICH;SKIBIN MIKHAIL GENNAD'EVICH;ZOTOV ALEKSANDR MIKHAJLOVICH;GUSARENKO SERGEJ PAVLOVICH;KRASNOPOL'SKIJ IVAN IVANOVICH
分类号 E02D27/08 主分类号 E02D27/08
代理机构 代理人
主权项
地址