发明名称 PLUGGING THIEF ZONES AND FRACTURES BY IN-SITU AND IN-DEPTH CRYSTALLIZATION FOR IMPROVING WATER SWEEP EFFICIENCY OF SANDSTONE AND CARBONATE RESERVOIRS
摘要 The present invention relates to methods and compositions that can be used to delay crystallization of a treatment solution so that thief zones or fractures are plugged in subterranean formations at a substantial distance from a wellbore. A supersaturated sodium aluminate solution, or other solutions, are introduced into the reservoir. The solution is relatively stable in the supersaturated state. Crystallization, or de-stabilizing the solution, can be controlled, which in turn plugs the thief zone or fracture at a designed point of time. By controlling the time that crystallization starts, i.e., the induction period, thief zones that are located at a substantial distant from the wellbore can be plugged.
申请公布号 CA2831963(A1) 申请公布日期 2012.11.22
申请号 CA20122831963 申请日期 2012.04.10
申请人 SAUDI ARABIAN OIL COMPANY 发明人 ZHOU, XIANMIN JOE;CHANG, YUN
分类号 C09K8/504 主分类号 C09K8/504
代理机构 代理人
主权项
地址