发明名称 CORE SYSTEM LOAD EVALUATION SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To inexpensively construct a load environment for totally evaluating a C-plane/U-plane for a core system. <P>SOLUTION: A core system load evaluation system comprises a plurality of evaluation systems which are disposed on a plurality of bases, respectively. Each of the plurality of evaluation systems includes a femtocell base station, a terminal which makes an actual call via the femtocell base station, and a terminal control system which controls a call originating operation and a call terminating operation of the terminal. One of the plurality of evaluation systems further includes a core system which is connected with the femtocell base stations of the plurality of evaluation systems over the Internet, a terminal control integrated system which remotely controls the terminal control systems of the plurality of evaluation systems over the Internet, and a femtocell control system which remotely controls the femtocell base stations of the plurality of evaluation systems over the Internet. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP2012231285(A) 申请公布日期 2012.11.22
申请号 JP20110098135 申请日期 2011.04.26
申请人 NEC CORP 发明人 OSHIMA TOSHIJI
分类号 H04W24/06;H04M3/26 主分类号 H04W24/06
代理机构 代理人
主权项
地址