发明名称 SLOPE SOIL NAILING AND MANAGEMENT METHOD USING AUTO CONTROLLED GROUTING SYSTEM
摘要 PURPOSE: A soil nailing and management method for a slope using an automatic grouting system is provided to cost-efficiently manage grouting quality in a construction site. CONSTITUTION: A soil nailing and management method for a slope using an automatic grouting system is as follows. A nail hole is formed on the ground. A nail is inserted into the nail hole. The inlet of the nail hole is caulked, and a grouting injection pipe is inserted into the nail hole. The inside of the nail hole is automatically grouted using an automatic grouting system. The end of the nail is finished. [Reference numerals] (AA) Boring a nail hole; (BB) Inserting a nail; (CC) Caulking; (DD) Automated grouting; (EE) System for managing automatic injection; (FF) Finishing(pressure plate)
申请公布号 KR101197647(B1) 申请公布日期 2012.11.07
申请号 KR20120034640 申请日期 2012.04.03
申请人 发明人
分类号 E02D5/80;E02D3/12;E02D17/20 主分类号 E02D5/80
代理机构 代理人
主权项
地址