发明名称 |
STEEL CONCRETE COMPOSITE SLEEPER TRACK AND IT'S CONSTRUCTION METHOD FOR RAILWAY BRIDGE |
摘要 |
PURPOSE: A steel composite concrete sleeper track for a railway bridge and a construction method thereof are provided to improve durability by forming the top of a slab using concrete and forming the bottom of the slab using a steel material. CONSTITUTION: A steel composite concrete sleeper track(T) for a railway bridge comprises a pair of foundations(100), a pair of supports(200), a slab(300), and shear connectors. The foundations are composed of a steel material and face each other. The supports are composed of a steel material and vertically and integrally formed on the foundations The slab is composed of a steel material and concrete and integrally crosses the gap between the supports. The shear connectors are installed on the top of the slab.
|
申请公布号 |
KR101195159(B1) |
申请公布日期 |
2012.10.29 |
申请号 |
KR20110130184 |
申请日期 |
2011.12.07 |
申请人 |
SEOHYUN ENGINEERING CO., LTD. |
发明人 |
JUNG, BYUNG RYUL;SUNG, DEOK YONG;CHOI, JUNG YOUL |
分类号 |
E01B2/00;E01B3/28;E01D21/00 |
主分类号 |
E01B2/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|