发明名称 STEEL CONCRETE COMPOSITE SLEEPER TRACK AND IT'S CONSTRUCTION METHOD FOR RAILWAY BRIDGE
摘要 PURPOSE: A steel composite concrete sleeper track for a railway bridge and a construction method thereof are provided to improve durability by forming the top of a slab using concrete and forming the bottom of the slab using a steel material. CONSTITUTION: A steel composite concrete sleeper track(T) for a railway bridge comprises a pair of foundations(100), a pair of supports(200), a slab(300), and shear connectors. The foundations are composed of a steel material and face each other. The supports are composed of a steel material and vertically and integrally formed on the foundations The slab is composed of a steel material and concrete and integrally crosses the gap between the supports. The shear connectors are installed on the top of the slab.
申请公布号 KR101195159(B1) 申请公布日期 2012.10.29
申请号 KR20110130184 申请日期 2011.12.07
申请人 SEOHYUN ENGINEERING CO., LTD. 发明人 JUNG, BYUNG RYUL;SUNG, DEOK YONG;CHOI, JUNG YOUL
分类号 E01B2/00;E01B3/28;E01D21/00 主分类号 E01B2/00
代理机构 代理人
主权项
地址